never ending project
so way back in april i went to submit drawings to the city for a building permit. thankfully, we got it. then we got some tenant changes and had to resubmit the drawings again per these changes.
of course being the city, they had to re-check everything they looked at and permitted before, in detail, rather than just paying attention to the clouded areas that pointed out where specific changes were made.
as a result, they pointed out discrepancies in the drawings, particularly the mechanical, thus having us make more changes.
it is now july. we have yet still to go back to the city to resubmit these tenant changes.
we were gonna go submit on july 5, but i was out on vacation. then when i got back the following week, the plan checker who we needed to meet with was out on vacation. so that plan checker is back this week and we're ready to go resubmit, so i call the city and find out the fire engineer we need to meet is out on vacation till next week.
the building opens in august.
0 Comments:
Post a Comment
<< Home